The Beginning

Saturday 3rd November 2007

I have 2 days off in a mad time at work. 8 am sees me outside trying to sift trough the piles to sort it out,

The first thing I did was to get the fuel tanks inside and coated with WD40 as I wont need them till March-08. I got as much done but having nobody else or the Frontloader I needed but couldnt get, I have to get more help next week.

I started on the Jigs for the boat. These will be welded to the RSJ frame to shape and support the boat.




Dara oversees the accuracy.



David helps with the assembly







6PM and 2 frames done and an hour later sees the 3rd one done.

PS. Anybody got a small crane for a week or 2.!