Pages

Minggu, 26 Juni 2016

Stuff Is Arriving

Sam the canvas man arrived today for the second fitting of the pram cover.  The design of the cover will permit the screen to remain in place with the cover completely down but can also be lowered or fully removed if required.

 There will be more side windows on the finished cover
and a dodger around the base

 The front screen

I also collected the oak doors from the carpenters today.  The small set will replace the steel ones in the forward bulkhead.  The tall ones are the bedroom and bathroom doors.




While Sam was working on the cover I cut out all the holes for the additional electronics to be fitted. Photo of this in a few days when they are fitted.

Related Posts by Categories

0 komentar:

Posting Komentar