Pages

Tampilkan postingan dengan label headoard. Tampilkan semua postingan
Tampilkan postingan dengan label headoard. Tampilkan semua postingan

Selasa, 15 Maret 2016

Headoard Kitchen Work

The custom made headboard was collected from the makers last Saturday.  I needed to finish making the bed base and once that was done I could fix the headboard in place.


The bed base lifts up to access a storage space.  Once I have the mattress  (Next Thursday) I can weight it and the base then I can get some gas struts made to the require lifting force to assist with and hold the base up when required.

I have been preparing the kitchen for the breakfast bar, while doing this it became apparent the island unit was pretty mobile at the end section.  This, in a stationary house is no problem but on a boat which moves about could be a problem especially as the weight of the worktops would act as a massive lever if the boat were to thing anything head on, or indeed if while being transported the lorry had to break suddenly.

A solution was needed.  Screwing through the end unit base would not be strong enough the load needed to be transferred through the vertical walls.  

I knew one day I would have a use for the really long screws that came with the engine crate.  

The head is 17mm AF to give it scale

I made a bracket to transfer the load through the vertical panel and some filler blocks to bear down onto once the screws were done up.

Glued and screwed

Stop blocks and 3 screws into the floor

The island end is now nice an rigid now. I will make a nice cover the the metal bracket to hide it in due course. 
Read More..